Chartreuse bridge | SGI - Engineering and prime contracting - FR


Chartreuse bridge

Grenoble (38) - France

Client

DV Construction on behalf of the General Council of Isère

Assignment

Studies of implementation - calculations - plans formwork - reinforcement drawings

Description

Design of the structure of art crossing the Isere Grenoble:
  • This is a combined structure with three bays (29.4 to 34.3 and 28.25 meters).
  • The deck consists of 10 steel beams and 2 consoles of 2.75 meters, from both sides.
  • Total length 94.75 meters, 10.85 meters wide.
  • The abutments are based on micropiles.